With over 11,000 LF of large diameter (20″-36″) sanitary sewer and watermain in Leesburg, the Village at Clear Spring Water & Sewer project, also known as JLMA West, is a challenging project perfectly suited for the expertise W.A. Hazel brings to the table.
The two proposed lines run parallel to one another for the majority of the project, bringing water & sewer service up to a future development for a repeat customer. The sewer is extremely deep, the majority 22′-30′ in depth. Both lines cross an active creek and multiple roadways – including the Dulles Greenway, necessitating 8 jack and bores.
Most of the project lies within a 50′ wide easement with limited access points, and the proposed grade of the sanitary sewer is well below 0.5% for the entire length of the project.
The WAH team is tackling these features, as well as common conditions of existing utilities and varying rock types, head-on with a combination of multiple top-notch crews and innovative means and methods and is on track to deliver public utility service to our customer on time and on budget.